New switchgear for Austin and Central Texas projects
Electrical projects across Austin and Central Texas need equipment selected for the building, power system, operating conditions, and planned loads—not just a product category. We manufacture and supply new switchgear for commercial, industrial, institutional, and other applications, with assemblies developed around project specifications. This page introduces the choices to resolve before requesting a quote and the information that helps move a project toward a suitable design.
Our equipment is built in the USA using all-American components, and custom assemblies can be produced to specification. We can ship nationwide, including to project sites in Central Texas. The right configuration, applicable standards, and production timing depend on the project; a location alone does not establish a rating, enclosure, delivery date, or equipment suitability. A qualified electrical professional should review the design and project requirements.
Start with the system role and application
Clarify what the equipment must do in the electrical distribution system. A project may call for a switchboard serving building distribution, switchgear associated with a more complex power arrangement, or equipment integrated with other specified components. The single-line diagram, utility interface, upstream and downstream devices, and intended operating sequence help distinguish among these needs. Equipment terminology can vary, so the specification and system diagram should govern the selection.
For Austin-area renovations, expansions, and new construction, establish whether the assembly will serve a new installation or connect to existing infrastructure. Identify the loads and spaces served, any planned capacity changes, and constraints such as access routes or available electrical-room space. These details help determine whether a standard arrangement is appropriate or a custom assembly is needed. They also help identify interface questions early, before procurement documents are finalized.
Confirm ratings and applicable standards
Voltage, continuous current, and short-circuit requirements must be established from the system design and verified for the proposed equipment. None should be inferred from a city, building type, or general product description. The project team should confirm system grounding, available fault current, protective-device coordination, and any specific operating requirements with qualified electrical professionals. Enclosure construction and environmental conditions also need review against the installation location and governing project documents.
Applicable standards depend on equipment type and design. UL 891 applies to suitable switchboard assemblies; it should not be assumed to cover every switchgear product or medium- and high-voltage equipment. A project specification should identify the required standard or listing where applicable and allow the manufacturer to confirm whether the proposed design meets it. Final acceptance remains subject to project requirements and review by the relevant authorities.
Shape a custom assembly around the project
A custom assembly can address a project’s specified arrangement, device positions, connections, metering provisions, and other defined requirements. The design process should begin with approved drawings and a clear equipment schedule, not assumptions about what a particular site needs. Where dimensions are constrained, provide room layouts, cable entry expectations, clearances, and handling or access limitations for review. Any requested feature should be checked for compatibility with the design and applicable requirements.
For projects serving multiple loads or operating areas, document how the equipment is expected to support the intended distribution scheme. Note required sections, feeder quantities, control or indication needs, and any interfaces with other equipment. Changes to these details can affect layout, engineering review, and procurement. A clearly scoped specification helps identify open decisions and supports a quote that reflects the requested assembly rather than an incomplete preliminary concept.
Coordinate engineering and project interfaces
Switchgear procurement depends on information from more than one discipline. Electrical engineers establish system requirements and protection criteria; contractors and project managers provide installation sequencing, site constraints, and schedule context; owners identify operational priorities. The equipment supplier needs the current specification, one-line diagram, relevant schedules, and any project-specific submittal requirements. Keeping these documents aligned reduces the risk of quoting or designing against superseded information.
For Central Texas delivery, coordinate the receiving location, site access, unloading responsibility, and the date the equipment is needed for the project sequence. These logistics should be discussed alongside the design rather than treated as automatic consequences of ordering. We can ship nationwide, but shipping arrangements and timing are project-specific. Lead times are determined by project scope, design status, required reviews, and procurement details; no fixed delivery promise should be assumed.
Plan reviews, testing, and documentation
Before release for production, confirm the equipment description, ratings, arrangement, connection requirements, and referenced drawings against the approved project documents. Establish who reviews submittals and how design comments or revisions will be resolved. If other equipment or systems must interface with the assembly, identify the responsible parties and information needed from them. Resolving these points before approval helps avoid late changes that may affect the design or schedule.
Define required inspection, testing, and documentation in the project specification. The applicable procedures depend on the assembly and governing requirements; do not assume a particular test, certificate, or listing without confirmation for the proposed design. Qualified project personnel should determine acceptance criteria and coordinate any required reviews with relevant authorities. These steps support a clear handoff from equipment design and procurement to the project’s installation and commissioning activities.
Request a quote with decision-ready information
For a project-specific quote, provide the equipment specification, latest single-line diagram, equipment schedule, applicable standards, and requested arrangement. Include the project location in Austin or elsewhere in Central Texas, desired delivery timing, and any known site or receiving constraints. Identify open questions explicitly—for example, pending fault-current data, unresolved feeder details, or a specification clause that needs clarification. This gives the manufacturer a basis to review scope and identify information still needed.
Before comparing proposals, check that each one addresses the same equipment function, ratings, arrangement, and documentation requirements. Confirm which details remain subject to engineering review, what assumptions were used, and whether proposed changes require approval. If project documents change after quotation, provide the revised information for reassessment. A complete, current package makes it easier to evaluate a custom assembly, coordinate procurement, and plan the next project decision without treating unverified details as settled.
Project specification checklist
Use this checklist to organize the details for a project-specific review. Final ratings, applicable standards and equipment selections depend on the approved design.
| Item | What to confirm |
|---|---|
| System application | Confirm the equipment’s role in the distribution system, connected loads, one-line diagram, and interfaces with existing or planned equipment. |
| Electrical ratings | Provide project-verified voltage, continuous current, and short-circuit requirements; qualified professionals should validate system conditions. |
| Standards and listing | Identify required standards and listings in the specification; applicability depends on equipment type and proposed design. |
| Assembly and site constraints | Confirm section arrangement, connections, room dimensions, access, environmental conditions, and any project-defined enclosure needs. |
| Submittals and testing | Specify required drawing reviews, inspection or testing criteria, documentation, and acceptance responsibilities. |
| Delivery and timing | Provide the Central Texas receiving location, site logistics, target schedule, and any constraints; lead time and shipping arrangements are project-specific. |